Embodied carbon · live project tracker

Project Calgary

Job C5687 · updated 17/11/2026

IDSL
2.921tCO₂e to date20 deliveries
1.83tonnes of ductwork
2.068tCO₂e savedX-Carb steel vs standard
2.921tCO₂e in November 2026latest month

Month by month

Material (EPD)DeliveryHover a month for figures
01.252.53.755Nov 26

Job to date

MaterialDeliveryTotal
Rectangular1.0690.2461.315
Spiral1.5780.0271.605
Total tCO₂e2.6470.2742.921

1.835 t of ductwork · 2.068 tCO₂e saved (X-Carb)

By month

MonthDeliveriestCO₂eRunning total
November 2026202.9212.921

Deliveries

How this is worked out. Material carbon = tonnes delivered × the supplier’s EPD factor (tCO₂e per tonne). Delivery carbon = the delivery vehicle’s CO₂ per mile × the round-trip road miles from the supplier’s depot to site, once per delivery. The saving compares rectangular ductwork made from X-Carb steel with the same tonnage of standard steel. Every delivery is checked by IDSL against its delivery note before it counts. Figures are tCO₂e.

Imperial Ductwork Services Ltd · CarbonFlow · 17/11/2026 09:22